SUPPLYING DUCTED METHOD OF AIR CONDITIONING SYSTEM
Prepare detailed construction engineering drawings for each part of the work, plan specific implementation parts and discuss with the project management board to coordinate deployment. Contact the management board of facilities to prepare vehicles and warehouses to gather goods and supplies.
According to the schedule in the schedule of construction progress, it has been discussed in detail with the project management board to carry out the assembly of machines, tools, construction equipment, supplies to the construction site.
Installing and supply ducted system temporary shielding walls (mobile canvas walls) to isolate construction areas and operating areas of equipment systems in preparation for carrying out partial construction works according to agreed plans not to affect the surrounding areas. Execution according to the rolling method, finish construction of each area and each system to ensure the regular operation of the system. After each day of construction, all tools and construction equipment must be collected in the right places and conducted clean industrial cleaning to ensure hygiene and beauty of the project.
Take the position of machine installation location of supplying ducted system including wind pipelines, main gas pipes, location of power supply for air conditioners. When determining, it is necessary to cover all cases in order to locate the most optimal position to conduct construction and installation.
– Installation of water pipes, wind pipes and pressure testing.
– Processing and manufacturing wind pipes.
– Installation of main power lines.
– Installation of equipment.
– Connecting water pipes, wind pipes.
– Test the entire system pressure.
– Wrap insulation, sound insulation routes he wind.
– Electric connection.
– Peace of the system.
– Calibrate and calibrate the system.
– Operation, test run.
– Technology transfer, instructions for operation and use.
– Hand over the entire system.
The process of replacing the installation follows the rolling plan, making the area to complete that area. During the installation process, it is necessary to regularly conduct industrial cleaning of construction areas to ensure hygiene and safety. After the installation of supplying ducted system is completed, it is necessary to calibrate and test the entire system to conduct a general cleaning of the whole project in order to prepare the measurement, technology transfer and acceptance.
The installation of air conditioning systems is in compliance with the current domestic air conditioning and construction installation standards and other relevant construction and installation standards. All construction and installation works must be based on detailed construction design drawings.
Determine the location of the gas pipeline for the air conditioning system to get the mark, determine the exact location of the parts to be assembled, the position of the pipe sections based on the design drawings and the actual structure of the building.
The racks and racks are linked to the construction structure with ciphers, ui, black dragon and lace hangers, all gas piping systems, racks, bolt catch holes, machined, Drilling and welding are available at the production site before being taken to the construction site.